Prepac GRGW-0709-6M Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Non Prepac GRGW-0709-6M. Prepac GRGW-0709-6M Installation Guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
CONTACT US FIRST
1-877-PREPAC1
1-877-773-7221
Mon - Fri 7am - 4pm PST
10am - 7pm EST
For help with assembly
If you have received a damaged or defective
part or are missing hardware.
We will process replacement parts in 2 business
days or less. Parts are shipped via UPS Ground or
mail.
Before you call please:
1) Record the following information from the
shipping label on the outside of the box.
You will need it for warranty purposes:
Ship To Name
Sales Order Number
2) Note the product model number.
3) Review the contents of your shipment to
determine what you are missing.
Online Option
Fill out the Replacement Parts Order form in the Product
Support section of our website: www.prepacmfg.com
Assembly Instructions
Prepac Manufacturing Ltd.
6705 Dennett Place
Delta, BC V4G 1N4
DATE STAMP
LB-0741
2014-05-21
Scan the
QR code
to view an
installation
video for
this product
Required Tools
stud
finder
3/16th inch drill bit
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - Assembly Instructions

CONTACT US [email protected] - Fri 7am - 4pm PST10am - 7pm ESTFor help with assemblyIf you have received a damag

Page 2 - Cabinet Parts

Page 10 of 207a7bWood DowelGoujons de boisInsert wood dowels into small (D3) and large (D8) drawer frontsInsérez les goujons de bois en avant de tiroi

Page 3 - Drawer Parts

Page 11 of 207dSlide the small (D2) and large (D7) drawer bottoms toward the bottom of the drawer sides until they connect with the metal frame. The

Page 4 - Hardware

Page 12 of 207fAttach handels with screws providedFixez les poignées avec vis fourniesWe recommend inserting drawers AFTER you complete the wall mount

Page 5

Page 13 of 20Before you begin: Make sure you have the following tools and hardware:• stud finder• power screwdriver or drill • 3/16th inch drill bi

Page 6

Page 14 of 20Hanging Multiple CabinetsWe will illustrate how hang multiple cabinets using the sample configuration below. 1. On your wall, mark where

Page 7 - Petit cabinet glisse en haut

Page 15 of 20The illustration below shows where the Metal Rails & Connecting Braces should be attached to the wood studs for this configurationNOT

Page 8 - Pour serrer les cames

Page 16 of 2031½12For Base Cabinets, measure 31½ inches from the floor and make multiple marks along the wall Pour armoires de base, mesurer 31½ pouce

Page 9

Page 17 of 2016”3Find the center of the wall studs and mark the location of each stud along the line. Studs are typically 16 inches apart center to c

Page 10

Page 18 of 20Hang the First RailAccrocher la première position de RailPosition the Metal Rail over the pre-drilled holes and insert wood screws into t

Page 11

Page 19 of 20Hanging the Second RailSlide the second Metal Rail BEHIND the Connecting Brace Secure the Connecting Brace to the Second Rail6Accrocher l

Page 12 - Insertion de tiroirs

Page 2 of 20Top (1)DessusTP-10055-G gray / grisGable (1)PignonGA-10057unfinished / non-finiLeft Side (1)Côté gaucheSL-10057-G gray / grisRight Side

Page 13 - 2 people required

Page 20 of 207Carefully hang the cabinet onto the Metal Rail until it locks into place. Laisser pendre soigneusement le cabinet sur la rail métalliq

Page 14 - Hanging Multiple Cabinets

Page 3 of 20Drawer PartsD3D1D4D2D5Large Drawer Back (2)Arrière du tiroir grandwhite / blancDK-10033-WLarge Drawer Bottom (2)Fond du tiroir grandwhite

Page 15 - Hanging a Single 30” Cabinet

Page 4 of 203’’ Wood Screw (3)Vis à bois 3 poucesRM-0835#8 - 1½” Screws (6)Vis no.8 - 1½ po.RM-0504Confirmat Screw (12)Vis ConfirmatRM-0001Wood Dowel

Page 16

Page 5 of 20Attach Rail Hooks to the Left (C3) and Right (C4) Sides as shown. Use wrench to tighten nuts. Fixez les crochets de suspension aux côtés g

Page 17

Page 6 of 20Attach Gable (C2) to Upper Stabilizer (C5) with Confirmat Screws Fixez le pignon (C2) et renforcement supérieure (C5) avec les Vis Confirm

Page 18 - Fixez le renfort reliant

Page 7 of 20Euro ScrewVis “Euro”Insert green twister dowels into Left (C3) & Right (C4) Sides Insérez les goujons verts à visser dans les côtés g

Page 19 - Hanging the Second Rail

Page 8 of 20C6C3C4C5Confirmat ScrewVis ConfirmatSTEP 3 Estimated Time: 10 minutes5aAttach Upper Stabilizer (C5) to Left (C3) and Right (C4) Sides

Page 20

Page 9 of 20Insert green twister dowels into Top (C1) Insérez les goujons verts à visser dans le dessus (C1)6a6bAttach the Top (C1) and tighten cams.

Commentaires sur ces manuels

Pas de commentaire